Data Center Directory

TDF ProxiCenter Lille Lambersart

TDF ProxiCenter Lille Lambersart is an operational data center in Lambersart, France. Our footprint estimate of its power is about 4.5 MW.

Key facts

StatusOperational
Facility power4.5 MW (range 2.3 MW to 7.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,779 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressRue Gambetta 35, 59130, Lambersart
Coordinates50.64854, 3.04009

Power and grid

Nearest high-voltage substationPoste électrique de Vertefeuille, 225 kV, 3.1 km away (RTE)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km10
Power plants within 50 km1.0 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.7 °C (2001 to 2025)
Cooling degree days67 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.11 kWh per m² per day
Wind at 50 m6.7 m/s average
Water stress todayHigh (40-80%) (Hauts-de-France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does TDF ProxiCenter Lille Lambersart use?

We estimate the facility power at about 4.5 MW. Estimate from building footprint, low confidence.

How close is TDF ProxiCenter Lille Lambersart to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste électrique de Vertefeuille (225 kV), about 3.1 km away.

How clean is the power for TDF ProxiCenter Lille Lambersart?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Data centers near Lambersart

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.