Oxya Datacenter is an operational data center in Loos, France. Our footprint estimate of its power is about 2.5 MW.

Key facts

StatusOperational
Facility power2.5 MW (range 1.2 MW to 3.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,051 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates50.61679, 3.02229

Power and grid

Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.7 °C (2001 to 2025)
Cooling degree days67 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.11 kWh per m² per day
Wind at 50 m6.7 m/s average
Water stress todayHigh (40-80%) (Hauts-de-France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Oxya Datacenter use?

We estimate the facility power at about 2.5 MW. Estimate from building footprint, low confidence.

How clean is the power for Oxya Datacenter?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.