Bouygues Télécom data center in Tours is an operational data center operated by Bouygues Télécom in Tours, France. Our footprint estimate of its power is about 1.4 MW.

Key facts

StatusOperational
OperatorBouygues Télécom
Facility power1.4 MW (range 0.7 MW to 2.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,200 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates47.43632, 0.70330

Power and grid

Nearest high-voltage substationPoste électrique de Chanceaux, 400 kV, 5.1 km away (RTE)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km1
Power plants within 50 km4.1 GW in 27 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature11.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.6 °C (2001 to 2025)
Cooling degree days210 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.45 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow (<10%) (Centre-Val de Loire)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Bouygues Télécom data center in Tours use?

We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.

How close is Bouygues Télécom data center in Tours to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste électrique de Chanceaux (400 kV), about 5.1 km away.

How clean is the power for Bouygues Télécom data center in Tours?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates Bouygues Télécom data center in Tours?

Bouygues Télécom.

Data centers near Tours

More Bouygues Télécom data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.