ADISTA Groupe
ADISTA Groupe is an operational data center operated by WEBINDUSTRIE in Tours, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | WEBINDUSTRIE |
| Address | 12 Rue Jacques-Petitjean |
| Coordinates | 47.38674, 0.69511 |
| Website | datacenter.cyres.fr |
Power and grid
| Nearest high-voltage substation | Poste électrique de Larçay, 400 kV, 6.7 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 1 |
| Power plants within 50 km | 4.1 GW in 26 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.6 °C (2001 to 2025) |
| Cooling degree days | 210 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.45 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low (<10%) (Centre-Val de Loire) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is ADISTA Groupe to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Larçay (400 kV), about 6.7 km away.
How clean is the power for ADISTA Groupe?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates ADISTA Groupe?
WEBINDUSTRIE.
Data centers near Tours
- Cogent Tours 5.1 km · 1.2 MW
- Datacenter Cyrès 5.5 km · 1.4 MW
- Bouygues Télécom data center in Tours 5.5 km · 1.4 MW
- Castle-IT Tours 6.9 km · 1.3 MW
- Sartera 76.3 km · 1.7 MW
- Bouygues Télécom data center in Poitiers 90.4 km · 1.9 MW
- Okantis 91.1 km
- EXA Edge DC Poitiers 91.6 km
More WEBINDUSTRIE data centers
- Datacenter Cyrès France