Datacenter Cyrès
Datacenter Cyrès is an operational data center operated by WEBINDUSTRIE in Tours, France. Our footprint estimate of its power is about 1.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | WEBINDUSTRIE |
| Facility power | 1.4 MW (range 0.7 MW to 2.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,179 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 3 networks PeeringDB. |
| Also known as | Groupe INHERENT |
| Address | 9 RUE DE SUÈDE, 37100 Tours |
| Coordinates | 47.43601, 0.69541 |
| Website | cyres.fr |
Power and grid
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.6 °C (2001 to 2025) |
| Cooling degree days | 210 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.45 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low (<10%) (Centre-Val de Loire) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Datacenter Cyrès use?
We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.
How clean is the power for Datacenter Cyrès?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Datacenter Cyrès?
WEBINDUSTRIE.
Data centers near Tours
- Bouygues Télécom data center in Tours 595 m · 1.4 MW
- Cogent Tours 760 m · 1.2 MW
- ADISTA Groupe 5.5 km
- Castle-IT Tours 11.1 km · 1.3 MW
- Sartera 71.5 km · 1.7 MW
- Bouygues Télécom data center in Poitiers 95.6 km · 1.9 MW
- Okantis 96.3 km
- EXA Edge DC Poitiers 96.9 km
More WEBINDUSTRIE data centers
- ADISTA Groupe France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.