Castle-IT Tours

Castle-IT Tours is an operational data center operated by Caste-IT in Larcay, France. Our footprint estimate of its power is about 1.3 MW.

Key facts

StatusOperational
OperatorCaste-IT
Facility power1.3 MW (range 0.7 MW to 2.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,087 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 560 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks
PeeringDB.
Also known asCastle IT
Address1 - 3 Rue des Pies-Grièches
Coordinates47.34958, 0.76930
Websitecastle-it.fr/housing

Power and grid

Nearest high-voltage substationUnnamed substation, 400 kV, 300 m away (RTE)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km1
Power plants within 50 km4.0 GW in 22 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature11.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.6 °C (2001 to 2025)
Cooling degree days233 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.45 kWh per m² per day
Wind at 50 m6.2 m/s average
Water stress todayLow (<10%) (Centre-Val de Loire)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Castle-IT Tours use?

We estimate the facility power at about 1.3 MW. Estimate from building footprint, low confidence.

How close is Castle-IT Tours to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (400 kV), about 300 m away.

How clean is the power for Castle-IT Tours?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates Castle-IT Tours?

Caste-IT.