Bouygues Télécom data center in Poitiers
Bouygues Télécom data center in Poitiers is an operational data center operated by Bouygues Télécom in Poitiers, France. Our footprint estimate of its power is about 1.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Bouygues Télécom |
| Facility power | 1.9 MW (range 1 MW to 3.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,620 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 810 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 46.61183, 0.33634 |
Power and grid
| Nearest high-voltage substation | Bonneau, 225 kV, 4.6 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 1 |
| Power plants within 50 km | 3.0 GW in 19 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.3 °C (2001 to 2025) |
| Cooling degree days | 241 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.55 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Bouygues Télécom data center in Poitiers use?
We estimate the facility power at about 1.9 MW. Estimate from building footprint, low confidence.
How close is Bouygues Télécom data center in Poitiers to the power grid?
The nearest high-voltage substation in OpenStreetMap is Bonneau (225 kV), about 4.6 km away.
How clean is the power for Bouygues Télécom data center in Poitiers?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Bouygues Télécom data center in Poitiers?
Bouygues Télécom.
Data centers near Poitiers
- Okantis 981 m
- Cogent Poitiers 2.6 km
- EXA Edge DC Poitiers 4.8 km
- DARVA Hosting 61.9 km
- Centre de données MAIF 62.1 km · 1.5 MW
- Castle-IT Tours 88.4 km · 1.3 MW
- ADISTA Groupe 90.4 km
- Cogent Tours 95.1 km · 1.2 MW
More Bouygues Télécom data centers
- Datacenter Bouygues Télécom France
- Datacenter Bouygues Télécom France
- Bouygues Telecom data center in Cabriès France
- Bouygues Télécom data center in Montpellier France
- Bouygues Télécom data center in Toulouse France
- Bouygues Télécom data center in Léognan France
- Bouygues Télécom data center in Nanterre France
- Bouygues Télécom data center in Tours France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.