UltraEdge Rennes
UltraEdge Rennes is an operational data center operated by UltraEdge in Cesson-Sévigné, France. Our footprint estimate of its power is about 3.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | UltraEdge |
| Facility power | 3.5 MW (range 1.8 MW to 5.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,933 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 9 networks PeeringDB. |
| Also known as | SFR Netcenter Rennes |
| Address | 7-9 allée de Bray, La Baraque |
| Coordinates | 48.11005, -1.61367 |
| Website | ultraedge.com |
Power and grid
| Nearest high-voltage substation | Poste électrique de Saint-Laurent, 225 kV, 4.3 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 3 |
| Power plants within 50 km | 172 MW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 99 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.31 kWh per m² per day |
| Wind at 50 m | 6.6 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does UltraEdge Rennes use?
We estimate the facility power at about 3.5 MW. Estimate from building footprint, low confidence.
How close is UltraEdge Rennes to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Saint-Laurent (225 kV), about 4.3 km away.
How clean is the power for UltraEdge Rennes?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates UltraEdge Rennes?
UltraEdge.
Data centers near Cesson-Sévigné
- ICODIA NETWORK INTEGRITY 1.1 km
- Cogent data center in Rennes 1.8 km
- TDF Datacenter Rennes Cesson 1.9 km
- Bouygues Télécom data center in Chantepie 2.0 km · 1.2 MW
- Cogent Rennes 2.2 km
- Nation Data Center Rennes 5.8 km · 2.7 MW
- BT Blue 15.6 km · 2.4 MW
- Datacenter Groupama 17.2 km · 5.7 MW
More UltraEdge data centers
- UltraEdge Strasbourg France
- UltraEdge Velizy France
- UltraEdge Lyon-Venissieux France
- UltraEdge Rezé France
- UltraEdge Bordeaux France
- Ultraedge Canteleu France
- UltraEdge Grenoble France
- UltraEdge Lille France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.