Data Center Directory

200 Quannapowitt Pkwy

200 Quannapowitt Pkwy is an operational data center operated by RJ Kelly in Wakefield, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorRJ Kelly
Networks1 networks
PeeringDB.
Address200 Quannapowitt Pkwy
Coordinates42.52053, -71.08498
Websiterjkellycompany.com

Power and grid

Nearest high-voltage substationWallace Substation, 115 kV, 3.5 km away (Wakefield Municipal Gas & Light Department)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationWakefield Junction Substation, 345 kV, 3.9 km away
HV substations within 10 km11
UtilityTown Of Reading (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityISNE
Nearest gas pipelinePNGTS/Maritimes & Northeast, interstate pipeline, 3.6 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.0 GW in 102 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity403 g CO₂ per kWh (Massachusetts, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 65.4%, solar 24.6%, oil and other fossil 4.5%, bioenergy 3.2%, hydro 1.4%. Clean power: 30.1%
Industrial power priceUSD 0.200 per kWh (Massachusetts, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38 °C (2001 to 2025)
Cooling degree days356 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.82 kWh per m² per day
Wind at 50 m4.7 m/s average
Water stress todayLow - Medium (10-20%) (Massachusetts)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is 200 Quannapowitt Pkwy to the power grid?

The nearest high-voltage substation in OpenStreetMap is Wallace Substation (115 kV), about 3.5 km away. The local utility is Town Of Reading, in the ISNE balancing area.

How clean is the power for 200 Quannapowitt Pkwy?

The grid in Massachusetts emits about 403 g CO₂ per kWh (2025). Largest sources: gas 65.4%, solar 24.6%, oil and other fossil 4.5%.

Who operates 200 Quannapowitt Pkwy?

RJ Kelly.

Data centers near Wakefield

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.