RagingWire VA2 - NTT
RagingWire VA2 - NTT is an operational data center operated by RagingWire Data Centers - NTT in Ashburn, United States. Its power is about 18 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | RagingWire Data Centers - NTT |
| Facility power | 18 MW Derived from a tagged IT power value. IT power tag in OpenStreetMap |
| IT power | 14 MW |
| GPU capacity if all AI | about 7,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 3 networks, 1 internet exchanges PeeringDB. |
| Also known as | NTT VA2 |
| Address | 44610 Guilford Dr |
| Coordinates | 39.02489, -77.45756 |
| Website | ragingwire.com |
Power and grid
| Nearest high-voltage substation | Beaumeade Substation, 230 kV, 200 m away (Virginia Electric & Power Company) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 51 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does RagingWire VA2 - NTT use?
Public data puts the facility power at about 18 MW. Derived from a tagged IT power value.
How close is RagingWire VA2 - NTT to the power grid?
The nearest high-voltage substation in OpenStreetMap is Beaumeade Substation (230 kV), about 200 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for RagingWire VA2 - NTT?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates RagingWire VA2 - NTT?
RagingWire Data Centers - NTT.
Data centers near Ashburn
- Lumen Ashburn 301 m · 9.2 MW
- RagingWire VA1 - NTT 340 m · 16 MW
- Equinix DC3 415 m · 7 MW
- Amazon Web Services 449 m · 77 MW
- Equinix DC16 462 m · 67 MW
- Digital Realty IAD (44490 Chilum) 485 m · 18 MW
- Centersquare Northern Virginia (IAD4) 494 m · 24 MW
- Amazon Web Services Datacenter Complex 537 m · 49 MW
More RagingWire Data Centers - NTT data centers
- RagingWire HI1 - NTT United States
- RagingWire CA2 - NTT United States
- RagingWire TX1 - NTT United States
- RagingWire CA1 - NTT United States
- RagingWire VA1 - NTT United States
- RagingWire CA3 - NTT United States
- RagingWire CH1 - NTT United States
- RagingWire VA3 - NTT United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.