RagingWire VA3 - NTT

RagingWire VA3 - NTT is an operational data center operated by RagingWire Data Centers - NTT in Ashburn, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorRagingWire Data Centers - NTT
Networks2 networks, 1 internet exchanges
PeeringDB.
Also known asRagingWire VA4 - NTT
Address21583 Megawatt Dr
Coordinates39.01929, -77.47065
Websiteragingwire.com

Power and grid

Nearest high-voltage substationFarmwell Substation, 230 kV, 500 m away (Virginia Electric & Power Company)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km54
UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 3.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.6 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.7 °C (2001 to 2025)
Cooling degree days729 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.98 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is RagingWire VA3 - NTT to the power grid?

The nearest high-voltage substation in OpenStreetMap is Farmwell Substation (230 kV), about 500 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.

How clean is the power for RagingWire VA3 - NTT?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.

Who operates RagingWire VA3 - NTT?

RagingWire Data Centers - NTT.

Data centers near Ashburn

More RagingWire Data Centers - NTT data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.