RagingWire HI1 - NTT

RagingWire HI1 - NTT is an operational data center operated by RagingWire Data Centers - NTT in Hillsboro, United States. Our footprint estimate of its power is about 30 MW.

Key facts

StatusOperational
OperatorRagingWire Data Centers - NTT
Facility power30 MW (range 15 MW to 48 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 25,087 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 13,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks
PeeringDB.
Also known asNTT RagingWire DC - Hillsboro
Address4050 NE Evergreen Rd
Coordinates45.54951, -122.93748
Websiteragingwire.com

Power and grid

Nearest high-voltage substationShute Substation, 115 kV, 900 m away (Portland General Electric)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationEvergreen Substation West, 230 kV, 1.1 km away
HV substations within 10 km12
UtilityPortland General Electric Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPGE
Nearest gas pipelineNorthwest Pipeline, interstate pipeline, 15.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km825 MW in 35 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity200 g CO₂ per kWh (Oregon, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2%
Industrial power priceUSD 0.087 per kWh (Oregon, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature10 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.3 °C (2001 to 2025)
Cooling degree days79 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.67 kWh per m² per day
Wind at 50 m4 m/s average
Water stress todayLow - Medium (10-20%) (Oregon)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does RagingWire HI1 - NTT use?

We estimate the facility power at about 30 MW. Estimate from building footprint, low confidence.

How close is RagingWire HI1 - NTT to the power grid?

The nearest high-voltage substation in OpenStreetMap is Shute Substation (115 kV), about 900 m away. The local utility is Portland General Electric Co, in the PGE balancing area.

How clean is the power for RagingWire HI1 - NTT?

The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.

Who operates RagingWire HI1 - NTT?

RagingWire Data Centers - NTT.

Data centers near Hillsboro

More RagingWire Data Centers - NTT data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.