T5@Portland
T5@Portland is an operational data center operated by T5 Data Centers in Hillsboro, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | T5 Data Centers |
| Networks | 1 networks PeeringDB. |
| Address | 4915 NE Starr Blvd |
| Coordinates | 45.55566, -122.93824 |
| Website | t5datacenters.com/locations/t5-portland |
Power and grid
| Nearest high-voltage substation | Shute Substation, 115 kV, 300 m away (Portland General Electric) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Evergreen Substation West, 230 kV, 600 m away |
| HV substations within 10 km | 11 |
| Utility | Portland General Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PGE |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 15 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 823 MW in 34 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 200 g CO₂ per kWh (Oregon, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2% |
| Industrial power price | USD 0.087 per kWh (Oregon, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.3 °C (2001 to 2025) |
| Cooling degree days | 79 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | Low - Medium (10-20%) (Oregon) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is T5@Portland to the power grid?
The nearest high-voltage substation in OpenStreetMap is Shute Substation (115 kV), about 300 m away. The local utility is Portland General Electric Co, in the PGE balancing area.
How clean is the power for T5@Portland?
The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.
Who operates T5@Portland?
T5 Data Centers.
Data centers near Hillsboro
- Flexential - Portland/Hillsboro 4 (PDX04) 82 m · 21 MW
- Stack Infrastructure - POR03 265 m · 8.6 MW
- STACK Infrastructure data center in Hillsboro 302 m · 6.9 MW
- Flexential - Portland/Hillsboro 3 (PDX03) 394 m · 31 MW
- QTS Data Center - Hillsboro 2 425 m · 16 MW
- HLBOORXH - Hawthorne Central Office 484 m
- QTS Data Center - Hillsboro 2 609 m · 18 MW
- RagingWire HI1 - NTT 686 m · 30 MW
More T5 Data Centers data centers
- T5 Data Centers data center in Lithia Springs United States
- T5@Cleveland United States
- T5@Chicago United States
- T5@Colorado Springs United States
- T5@Charlotte United States
- T5@Atlanta United States
- T5@Augusta United States
- T5@Cincinnati United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.