Aligned IAD-01
Aligned IAD-01 is an operational data center operated by Aligned in Ashburn, United States. Its power is about 78 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Aligned |
| Facility power | 78 MW Derived from a tagged IT power value. IT power tag in OpenStreetMap |
| IT power | 60 MW |
| GPU capacity if all AI | about 33,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | IAD |
| Address | Uunet Drive 21890, 20147, Ashburn |
| Opened | 2020 |
| Coordinates | 39.01361, -77.47056 |
Power and grid
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 2.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Aligned IAD-01 use?
Public data puts the facility power at about 78 MW. Derived from a tagged IT power value.
How clean is the power for Aligned IAD-01?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Aligned IAD-01?
Aligned.
Data centers near Ashburn
- Aligned Ashburn (IAD-01) 84 m
- Data center in Ashburn 206 m · 4.9 MW
- Digital Realty IAD (21745 Sir Timothy) 373 m · 38 MW
- Equinix DC13 434 m · 16 MW
- NTT Ashburn Campus 498 m · 21 MW
- Aligned Ashburn (IAD-02) 524 m · 156 MW
- Digital Realty IAD (21625 Gresham) 606 m · 44 MW
- RC-Facility 628 m
More Aligned data centers
- Aligned IAD-03 United States
- Aligned Data Center - Chicago ORD-01 United States
- Aligned DFW-02 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.