Aligned Ashburn (IAD-01)
Aligned Ashburn (IAD-01) is an operational data center operated by Aligned Data Centers in Ashburn, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Aligned Data Centers |
| Networks | 1 networks PeeringDB. |
| Address | 21890 Uunet Drive |
| Coordinates | 39.01400, -77.46973 |
| Website | aligneddc.com/ashburn |
Power and grid
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 2.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Aligned Ashburn (IAD-01)?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Aligned Ashburn (IAD-01)?
Aligned Data Centers.
Data centers near Ashburn
- Aligned IAD-01 84 m · 78 MW
- Data center in Ashburn 282 m · 4.9 MW
- Digital Realty IAD (21745 Sir Timothy) 296 m · 38 MW
- NTT Ashburn Campus 479 m · 21 MW
- Equinix DC13 515 m · 16 MW
- Digital Realty IAD (21625 Gresham) 525 m · 44 MW
- RagingWire VA3 - NTT 594 m
- Aligned Ashburn (IAD-02) 607 m · 156 MW
More Aligned Data Centers data centers
- Aligned Ashburn (IAD-02) United States
- Aligned Data Centers United States
- Aligned Phoenix (PHX-01) United States
- Aligned Data Centers DFW-04 United States
- Alinged Data Center DFW-03 United States
- Aligned DC - PDX-01 United States
- Aligned Data Centers United States
- Aligned Dallas (DFW-01) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.