Aligned Ashburn (IAD-02)
Aligned Ashburn (IAD-02) is an operational data center operated by Aligned Data Centers in Ashburn, United States. Its power is about 156 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Aligned Data Centers |
| Facility power | 156 MW Derived from a tagged IT power value. IT power tag in OpenStreetMap |
| IT power | 120 MW |
| GPU capacity if all AI | about 67,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Aligned IAD-02 |
| Address | 21821 Uunet Dr |
| Opened | 2021 |
| Coordinates | 39.01056, -77.47518 |
| Website | aligneddc.com/ashburn |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 800 m away (Virginia Electric & Power Company) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 58 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Columbia Gas Trans Co, interstate pipeline, 2.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.6 GW in 41 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.7 °C (2001 to 2025) |
| Cooling degree days | 729 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.98 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Aligned Ashburn (IAD-02) use?
Public data puts the facility power at about 156 MW. Derived from a tagged IT power value.
How close is Aligned Ashburn (IAD-02) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 800 m away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for Aligned Ashburn (IAD-02)?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates Aligned Ashburn (IAD-02)?
Aligned Data Centers.
Data centers near Ashburn
- CloudHQ LC5 176 m · 18 MW
- Equinix DC13 224 m · 16 MW
- Data center in Ashburn 339 m · 4.9 MW
- CloudHQ LC14 500 m · 140 MW
- Aligned IAD-01 524 m · 78 MW
- Sabey Intergate.Ashburn 595 m · 30 MW
- Aligned Ashburn (IAD-01) 607 m
- CloudHQ LC12 638 m · 140 MW
More Aligned Data Centers data centers
- Aligned Data Centers United States
- Aligned Phoenix (PHX-01) United States
- Aligned Data Centers DFW-04 United States
- Alinged Data Center DFW-03 United States
- Aligned DC - PDX-01 United States
- Aligned Data Centers United States
- Aligned Dallas (DFW-01) United States
- Aligned Ashburn (IAD-01) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.