Alinged Data Center DFW-03
Alinged Data Center DFW-03 is an operational data center operated by Aligned Data Centers in Mansfield, United States. Our footprint estimate of its power is about 17 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Aligned Data Centers |
| Facility power | 17 MW (range 8.3 MW to 27 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,890 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Britton Road 3801, 76063, Mansfield |
| Coordinates | 32.54982, -97.07486 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 345 kV, 300 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Utility | Denton County Elec Coop, INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ERCO |
| Nearest gas pipeline | Atmos Pipeline - Texas, intrastate pipeline, 1.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.1 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 18.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.3 °C (2001 to 2025) |
| Cooling degree days | 1,598 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.71 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Alinged Data Center DFW-03 use?
We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.
How close is Alinged Data Center DFW-03 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (345 kV), about 300 m away. The local utility is Denton County Elec Coop, INC, in the ERCO balancing area.
How clean is the power for Alinged Data Center DFW-03?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates Alinged Data Center DFW-03?
Aligned Data Centers.
Data centers near Mansfield
- Google 12.0 km · 23 MW
- Google 12.3 km · 53 MW
- Google Midlothian 12.5 km · 123 MW
- Compass Data Center 25.4 km · 5 MW
- Novartis 25.6 km · 4.4 MW
- Compass Data Center 25.6 km · 39 MW
- Compass Data Center 25.6 km · 39 MW
- Google Red Oak 26.1 km · 93 MW
More Aligned Data Centers data centers
- Aligned Ashburn (IAD-02) United States
- Aligned Data Centers United States
- Aligned Phoenix (PHX-01) United States
- Aligned Data Centers DFW-04 United States
- Aligned DC - PDX-01 United States
- Aligned Data Centers United States
- Aligned Dallas (DFW-01) United States
- Aligned Ashburn (IAD-01) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.