Alinged Data Center DFW-03

Alinged Data Center DFW-03 is an operational data center operated by Aligned Data Centers in Mansfield, United States. Our footprint estimate of its power is about 17 MW.

Key facts

StatusOperational
OperatorAligned Data Centers
Facility power17 MW (range 8.3 MW to 27 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 13,890 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 7,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressBritton Road 3801, 76063, Mansfield
Coordinates32.54982, -97.07486

Power and grid

Nearest high-voltage substationUnnamed substation, 345 kV, 300 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km6
UtilityDenton County Elec Coop, INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityERCO
Nearest gas pipelineAtmos Pipeline - Texas, intrastate pipeline, 1.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km5.1 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity379 g CO₂ per kWh (Texas, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8%
Industrial power priceUSD 0.072 per kWh (Texas, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature18.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature45.3 °C (2001 to 2025)
Cooling degree days1,598 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.71 kWh per m² per day
Wind at 50 m6.4 m/s average
Water stress todayHigh (40-80%) (Texas)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Alinged Data Center DFW-03 use?

We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.

How close is Alinged Data Center DFW-03 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (345 kV), about 300 m away. The local utility is Denton County Elec Coop, INC, in the ERCO balancing area.

How clean is the power for Alinged Data Center DFW-03?

The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.

Who operates Alinged Data Center DFW-03?

Aligned Data Centers.

Data centers near Mansfield

More Aligned Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.