Novartis
Novartis is an operational data center in Everman, United States. Our footprint estimate of its power is about 4.4 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.4 MW (range 2.2 MW to 7.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,699 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 32.65120, -97.31967 |
Power and grid
| Utility | Denton County Elec Coop, INC (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | Energy Transfer, intrastate pipeline, 7.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Novartis use?
We estimate the facility power at about 4.4 MW. Estimate from building footprint, low confidence.
How clean is the power for Novartis?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Data centers near Everman
- Alpheus Fort Worth (307 W 7th St) 11.2 km
- Alinged Data Center DFW-03 25.6 km · 17 MW
- CyrusOne data center in Fort Worth 28.3 km · 15 MW
- Amazon Web Services 32.2 km · 5 MW
- Centersquare Dallas (DFW1) 33.0 km · 51 MW
- Google 33.5 km · 23 MW
- Google 33.8 km · 53 MW
- Google Midlothian 34.5 km · 123 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.