Printer's Square Chicago (600 S Federal) is an operational data center operated by Printer's Square in Chicago, United States. Our footprint estimate of its power is about 0.9 MW.

Key facts

StatusOperational
OperatorPrinter's Square
Facility power0.9 MW (range 0.4 MW to 1.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 726 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 380 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks7 networks, 3 internet exchanges
PeeringDB.
Also known asDigital Realty CHI (600-780 S Federal) · DataBank Chicago (ORD1) · CDC2 - 600 S Federal st · Digital Realty ORD11
Address600 S Federal
Coordinates41.87430, -87.62993
Websiteprinterssquare.com

Power and grid

Nearest high-voltage substationLaSalle Substation, 138 kV, 200 m away (Commonwealth Edison)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationComEd Taylor 138kV-345kV Substation, 345 kV, 700 m away
HV substations within 10 km31
UtilityCommonwealth Edison Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineNatural Gas PL Co of Am, interstate pipeline, 9.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.5 GW in 33 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity247 g CO₂ per kWh (Illinois, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3%
Industrial power priceUSD 0.113 per kWh (Illinois, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.7 °C (2001 to 2025)
Cooling degree days362 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.67 kWh per m² per day
Wind at 50 m7.3 m/s average
Water stress todayMedium - High (20-40%) (Illinois)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Printer's Square Chicago (600 S Federal) use?

We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.

How close is Printer's Square Chicago (600 S Federal) to the power grid?

The nearest high-voltage substation in OpenStreetMap is LaSalle Substation (138 kV), about 200 m away. The local utility is Commonwealth Edison Co, in the PJM balancing area.

How clean is the power for Printer's Square Chicago (600 S Federal)?

The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.

Who operates Printer's Square Chicago (600 S Federal)?

Printer's Square.

Data centers near Chicago

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.