Serverfarm TiTAN Moses Lake
Serverfarm TiTAN Moses Lake is an operational data center operated by Serverfarm in Moses Lake, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Serverfarm |
| Networks | 2 networks PeeringDB. |
| Address | 4949 Randolph Rd NE |
| Coordinates | 47.18150, -119.32150 |
| Website | serverfarmllc.com/data-centers/moses-lake-data-center |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 2.9 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 3.6 km away |
| HV substations within 10 km | 9 |
| Utility | PUD No 2 Of Grant County (political subdivision) Electric retail service territory (HIFLD, US government). |
| Balancing authority | GCPD |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 8.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 128 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 135 g CO₂ per kWh (Washington, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9% |
| Industrial power price | USD 0.074 per kWh (Washington, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.6 °C (2001 to 2025) |
| Cooling degree days | 531 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.11 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Washington) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Serverfarm TiTAN Moses Lake to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 2.9 km away. The local utility is PUD No 2 Of Grant County, in the GCPD balancing area.
How clean is the power for Serverfarm TiTAN Moses Lake?
The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.
Who operates Serverfarm TiTAN Moses Lake?
Serverfarm.
Data centers near Moses Lake
- Data center in Quincy 37.8 km · 13 MW
- Data center in Quincy 37.9 km · 20 MW
- Data center in Quincy 37.9 km · 13 MW
- Vantage Quincy Campus 38.0 km · 27 MW
- Intergate.Quincy 38.0 km · 45 MW
- Data center in Quincy 38.2 km · 34 MW
- H5 Data Center 38.4 km · 24 MW
- H5 Data Centers Quincy 38.4 km · 21 MW
More Serverfarm data centers
- Serverfarm CH1 Chicago United States
- Serverfarm LAX1 Los Angeles United States
- Serverfarm LON1 – London Data Center United Kingdom
- ServerFarm SC1 United States
- Serverfarm AMS1 Amsterdam Netherlands
- Serverfarm ATL1 Atlanta United States
- Serverfarm CH2 Oak Brook / Chicago United States
- Serverfarm TOR1 Toronto Canada
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.