Data Center Directory

Serverfarm TiTAN Moses Lake

Serverfarm TiTAN Moses Lake is an operational data center operated by Serverfarm in Moses Lake, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorServerfarm
Networks2 networks
PeeringDB.
Address4949 Randolph Rd NE
Coordinates47.18150, -119.32150
Websiteserverfarmllc.com/data-centers/moses-lake-data-center

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 2.9 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 230 kV, 3.6 km away
HV substations within 10 km9
UtilityPUD No 2 Of Grant County (political subdivision)
Electric retail service territory (HIFLD, US government).
Balancing authorityGCPD
Nearest gas pipelineNorthwest Pipeline, interstate pipeline, 8.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km128 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity135 g CO₂ per kWh (Washington, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9%
Industrial power priceUSD 0.074 per kWh (Washington, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.6 °C (2001 to 2025)
Cooling degree days531 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.11 kWh per m² per day
Wind at 50 m5.1 m/s average
Water stress todayLow - Medium (10-20%) (Washington)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Serverfarm TiTAN Moses Lake to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 2.9 km away. The local utility is PUD No 2 Of Grant County, in the GCPD balancing area.

How clean is the power for Serverfarm TiTAN Moses Lake?

The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.

Who operates Serverfarm TiTAN Moses Lake?

Serverfarm.

Data centers near Moses Lake

More Serverfarm data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.