Data center in Quincy is an operational data center in Quincy, United States. Our footprint estimate of its power is about 20 MW.

Key facts

StatusOperational
Facility power20 MW (range 10 MW to 33 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 17,074 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 8,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates47.24767, -119.81308

Power and grid

Nearest high-voltage substationUnnamed substation, 230 kV, 4.1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km2
UtilityPUD No 2 Of Grant County (political subdivision)
Electric retail service territory (HIFLD, US government).
Balancing authorityGCPD
Nearest gas pipelineNorthwest Pipeline, interstate pipeline, 21 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.2 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity135 g CO₂ per kWh (Washington, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9%
Industrial power priceUSD 0.074 per kWh (Washington, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.1 °C (2001 to 2025)
Cooling degree days327 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.11 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayLow - Medium (10-20%) (Washington)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Quincy use?

We estimate the facility power at about 20 MW. Estimate from building footprint, low confidence.

How close is Data center in Quincy to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 4.1 km away. The local utility is PUD No 2 Of Grant County, in the GCPD balancing area.

How clean is the power for Data center in Quincy?

The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.