H5 Data Centers Quincy 2/3
H5 Data Centers Quincy 2/3 is an operational data center operated by H5 Data Centers in Quincy, United States. Our footprint estimate of its power is about 16 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | H5 Data Centers |
| Facility power | 16 MW (range 8.1 MW to 26 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,452 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | 1500 M Street NE |
| Coordinates | 47.24792, -119.82492 |
| Website | h5datacenters.com/quincy-II-colocation.html |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 3.2 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Utility | PUD No 2 Of Grant County (political subdivision) Electric retail service territory (HIFLD, US government). |
| Balancing authority | GCPD |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 20.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.2 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 135 g CO₂ per kWh (Washington, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9% |
| Industrial power price | USD 0.074 per kWh (Washington, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.1 °C (2001 to 2025) |
| Cooling degree days | 327 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.11 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Low - Medium (10-20%) (Washington) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does H5 Data Centers Quincy 2/3 use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
How close is H5 Data Centers Quincy 2/3 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 3.2 km away. The local utility is PUD No 2 Of Grant County, in the GCPD balancing area.
How clean is the power for H5 Data Centers Quincy 2/3?
The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.
Who operates H5 Data Centers Quincy 2/3?
H5 Data Centers.
Data centers near Quincy
- Yahoo Data Center 181 m · 25 MW
- Data center in Quincy 425 m · 3 MW
- H5 Data Center 617 m · 24 MW
- Data center in Quincy 620 m · 34 MW
- H5 Data Centers Quincy 641 m · 21 MW
- Intergate.Quincy 718 m · 45 MW
- Data center in Quincy 864 m · 13 MW
- Data center in Quincy 894 m · 20 MW
More H5 Data Centers data centers
- H5 Data Centers Ashburn United States
- H5 Data Centers Omaha United States
- H5 Data Centers Quincy United States
- H5 Data Centers Virginia (4030) United States
- H5 Data Centers Minneapolis United States
- H5 Data Centers Phoenix United States
- H5 Data Centers San Antonio United States
- H5 Data Centers Albuquerque United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.