Data center in Quincy

Data center in Quincy is an operational data center in Quincy, United States. Our footprint estimate of its power is about 3 MW.

Key facts

StatusOperational
Facility power3 MW (range 1.5 MW to 4.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,518 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates47.24599, -119.82979

Power and grid

Nearest high-voltage substationUnnamed substation, 230 kV, 2.8 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km2
UtilityPUD No 2 Of Grant County (political subdivision)
Electric retail service territory (HIFLD, US government).
Balancing authorityGCPD
Nearest gas pipelineNorthwest Pipeline, interstate pipeline, 19.8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km3.2 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity135 g CO₂ per kWh (Washington, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9%
Industrial power priceUSD 0.074 per kWh (Washington, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.1 °C (2001 to 2025)
Cooling degree days327 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.11 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayLow - Medium (10-20%) (Washington)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Quincy use?

We estimate the facility power at about 3 MW. Estimate from building footprint, low confidence.

How close is Data center in Quincy to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 2.8 km away. The local utility is PUD No 2 Of Grant County, in the GCPD balancing area.

How clean is the power for Data center in Quincy?

The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.