Serverfarm TOR1 Toronto
Serverfarm TOR1 Toronto is an operational data center operated by Serverfarm in North York, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Serverfarm |
| Networks | 1 networks PeeringDB. |
| Address | 300 Bartor Rd |
| Coordinates | 43.72933, -79.52703 |
| Website | serverfarmllc.com/data-centers/toronto-data-center |
Power and grid
| Nearest high-voltage substation | Finch TS, 230 kV, 2.9 km away (Hydro One) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 12 |
| Power plants within 50 km | 5.2 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.2 °C (2001 to 2025) |
| Cooling degree days | 288 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.65 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Serverfarm TOR1 Toronto to the power grid?
The nearest high-voltage substation in OpenStreetMap is Finch TS (230 kV), about 2.9 km away.
How clean is the power for Serverfarm TOR1 Toronto?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Serverfarm TOR1 Toronto?
Serverfarm.
Data centers near North York
- Digital Realty YYZ11 Toronto (1 Century) 5.5 km
- Digital Realty Toronto YYZ11 5.6 km · 69 MW
- Colosseum Online Inc. 6.3 km
- Urbacon Data Centre 7.6 km · 24 MW
- Hut 8 GTA2 7.7 km
- Cogent Mississauga 8.7 km
- 210 Sheppard Avenue East 10.8 km
- Hut 8 GTA1 12.0 km
More Serverfarm data centers
- Serverfarm CH1 Chicago United States
- Serverfarm LAX1 Los Angeles United States
- Serverfarm LON1 – London Data Center United Kingdom
- ServerFarm SC1 United States
- Serverfarm AMS1 Amsterdam Netherlands
- Serverfarm ATL1 Atlanta United States
- Serverfarm CH2 Oak Brook / Chicago United States
- Serverfarm TiTAN Moses Lake United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.