Hut 8 GTA2
Hut 8 GTA2 is an operational data center operated by Hut 8 HPC in Vaughan, Canada. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (AMD possible) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Hut 8 HPC |
| AI chips | NVIDIA GPUs (AMD possible) Guess from the operator, not confirmed. GPU cloud and AI hosting firms mostly deploy NVIDIA, a few deploy AMD. |
| Address | 27 Buttermill Ave |
| Coordinates | 43.79847, -79.52969 |
| Website | hut8.io |
Power and grid
| Nearest high-voltage substation | Finch TS, 230 kV, 4.9 km away (Hydro One) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 7 |
| Power plants within 50 km | 5.2 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 7.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.8 °C (2001 to 2025) |
| Cooling degree days | 307 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.62 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does Hut 8 GTA2 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (AMD possible).
How close is Hut 8 GTA2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Finch TS (230 kV), about 4.9 km away.
How clean is the power for Hut 8 GTA2?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Hut 8 GTA2?
Hut 8 HPC.
Data centers near Vaughan
- Digital Realty Toronto YYZ11 2.3 km · 69 MW
- Digital Realty YYZ11 Toronto (1 Century) 2.6 km
- Colosseum Online Inc. 3.8 km
- Serverfarm TOR1 Toronto 7.7 km
- Urbacon Data Centre 9.7 km · 24 MW
- 210 Sheppard Avenue East 11.0 km
- Rogers Data Center 14.2 km · 7.9 MW
- EdgeConneX Toronto (EDCTOR01) 15.1 km · 5.3 MW
More Hut 8 HPC data centers
- Hut 8 GTA1 Canada
- Hut 8 KEL1 Canada
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.