Hut 8 KEL1 is an operational data center operated by Hut 8 HPC in Kelowna, Canada. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (AMD possible) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Hut 8 HPC |
| AI chips | NVIDIA GPUs (AMD possible) Guess from the operator, not confirmed. GPU cloud and AI hosting firms mostly deploy NVIDIA, a few deploy AMD. |
| Address | 200-2130 Leckie Place |
| Coordinates | 49.88560, -119.44166 |
| Website | hut8.io/high-performance-computing/colocation |
Power and grid
| Nearest high-voltage substation | Glenmore Substation, 138 kV, 900 m away (FortisBC) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Lee Terminal, 230 kV, 7.1 km away |
| HV substations within 10 km | 10 |
| Utility | Fortisbc (investor owned) Electric retail service territory (HIFLD, US government). |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 4.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.7 °C (2001 to 2025) |
| Cooling degree days | 82 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.38 kWh per m² per day |
| Wind at 50 m | 3.3 m/s average |
| Water stress today | Low (<10%) (British Columbia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does Hut 8 KEL1 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (AMD possible).
How close is Hut 8 KEL1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Glenmore Substation (138 kV), about 900 m away. The local utility is Fortisbc.
How clean is the power for Hut 8 KEL1?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Hut 8 KEL1?
Hut 8 HPC.
Data centers near Kelowna
- Provision Data LM4DC2 1.5 km
More Hut 8 HPC data centers