EdgeConneX Toronto (EDCTOR01) is an operational data center operated by EdgeConneX in North York, Canada. Our footprint estimate of its power is about 5.3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeConneX |
| Facility power | 5.3 MW (range 2.6 MW to 8.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,397 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | Edgeconnex Toronto |
| Address | 565 Gordon Baker Rd |
| Coordinates | 43.80952, -79.34270 |
| Website | edgeconnex.com |
Power and grid
| Nearest high-voltage substation | Leslie Transmission Station, 230 kV, 2.5 km away (Hydro One) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 10 |
| Power plants within 50 km | 5.2 GW in 13 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 7.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.8 °C (2001 to 2025) |
| Cooling degree days | 307 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.62 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does EdgeConneX Toronto (EDCTOR01) use?
We estimate the facility power at about 5.3 MW. Estimate from building footprint, low confidence.
How close is EdgeConneX Toronto (EDCTOR01) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Leslie Transmission Station (230 kV), about 2.5 km away.
How clean is the power for EdgeConneX Toronto (EDCTOR01)?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates EdgeConneX Toronto (EDCTOR01)?
EdgeConneX.
Data centers near North York
- Rogers 1.9 km · 8.6 MW
- Nuday DC1 2.0 km · 2.4 MW
- Data center in Markham 3.2 km · 25 MW
- Digital Realty YYZ10 Toronto (371 Gough) 3.6 km · 14 MW
- Cyxtera Toronto YYZ2 3.8 km · 19 MW
- Centersquare Toronto (YYZ2) 3.9 km
- Equinix TR5 - Toronto 4.2 km · 12 MW
- Rogers Data Center 4.3 km · 7.9 MW
More EdgeConneX data centers
- EdgeConneX PHX02 Data Center United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex DUB04 Ireland
- EdgeConneX Germany
- EdgeConneX Chicago (EDCCHI02) United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex - DEN02 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.