Equinix TR5 - Toronto is an operational data center operated by Equinix in Markham, Canada. Our footprint estimate of its power is about 12 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power12 MW (range 6.2 MW to 20 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,330 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asEquinix Markham TR5
Address8100 Warden Street
Coordinates43.84689, -79.33335
Websiteequinix.com/locations/americas-colocation/canada-colocation/toronto-data-centers/tr5

Power and grid

Nearest high-voltage substationUnnamed substation, 500 kV, 1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km9
Power plants within 50 km8.1 GW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity192 g CO₂ per kWh (Canada, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5%

Climate and water

Average temperature7.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.8 °C (2001 to 2025)
Cooling degree days307 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.62 kWh per m² per day
Wind at 50 m6.7 m/s average
Water stress todayLow - Medium (10-20%) (Ontario)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix TR5 - Toronto use?

We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.

How close is Equinix TR5 - Toronto to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (500 kV), about 1 km away.

How clean is the power for Equinix TR5 - Toronto?

The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.

Who operates Equinix TR5 - Toronto?

Equinix.

Data centers near Markham

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.