Equinix TR5 - Toronto
Equinix TR5 - Toronto is an operational data center operated by Equinix in Markham, Canada. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 12 MW (range 6.2 MW to 20 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,330 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Equinix Markham TR5 |
| Address | 8100 Warden Street |
| Coordinates | 43.84689, -79.33335 |
| Website | equinix.com/locations/americas-colocation/canada-colocation/toronto-data-centers/tr5 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 500 kV, 1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 9 |
| Power plants within 50 km | 8.1 GW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 7.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.8 °C (2001 to 2025) |
| Cooling degree days | 307 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.62 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix TR5 - Toronto use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
How close is Equinix TR5 - Toronto to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (500 kV), about 1 km away.
How clean is the power for Equinix TR5 - Toronto?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Equinix TR5 - Toronto?
Equinix.
Data centers near Markham
- Cologix TOR4 848 m · 26 MW
- Digital Realty YYZ10 Toronto (371 Gough) 1.2 km · 14 MW
- Centersquare Toronto (YYZ2) 1.6 km
- Cyxtera Toronto YYZ2 1.6 km · 19 MW
- Data center in Markham 1.8 km · 25 MW
- Pathway Communications 2.2 km
- Nuday DC1 2.2 km · 2.4 MW
- Rogers 2.4 km · 8.6 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data