Rogers is an operational data center in Markham, Canada. Our footprint estimate of its power is about 8.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 8.6 MW (range 4.3 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,161 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Markham |
| Coordinates | 43.82688, -79.34319 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Rogers use?
We estimate the facility power at about 8.6 MW. Estimate from building footprint, low confidence.
Data centers near Markham
- Nuday DC1 699 m · 2.4 MW
- EdgeConneX Toronto (EDCTOR01) 1.9 km · 5.3 MW
- Data center in Markham 2.0 km · 25 MW
- Digital Realty YYZ10 Toronto (371 Gough) 2.0 km · 14 MW
- Equinix TR5 - Toronto 2.4 km · 12 MW
- Cyxtera Toronto YYZ2 2.5 km · 19 MW
- Centersquare Toronto (YYZ2) 2.5 km
- Rogers Data Center 2.6 km · 7.9 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.