Data Center Directory

Data center in Markham

Data center in Markham is an operational data center in Markham, Canada. Our footprint estimate of its power is about 25 MW.

Key facts

StatusOperational
Facility power25 MW (range 13 MW to 40 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 20,843 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 11,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressMarkham
Coordinates43.83335, -79.32054

Power and grid

Grid carbon intensity192 g CO₂ per kWh (Canada, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5%

Climate and water

Average temperature7.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.8 °C (2001 to 2025)
Cooling degree days307 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.62 kWh per m² per day
Wind at 50 m6.7 m/s average
Water stress todayLow - Medium (10-20%) (Ontario)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Markham use?

We estimate the facility power at about 25 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Markham?

The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.

Data centers near Markham

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.