Centersquare Toronto (YYZ2)
Centersquare Toronto (YYZ2) is an operational data center operated by Centersquare in Markham, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Centersquare |
| Networks | 3 networks, 1 internet exchanges PeeringDB. |
| Address | 4175 14th Avenue |
| Coordinates | 43.83913, -79.31643 |
| Website | centersquaredc.com/data-centers/toronto |
Power and grid
| Nearest high-voltage substation | Parkway TS, 500 kV, 1.7 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Power plants within 50 km | 8.1 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 7.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.8 °C (2001 to 2025) |
| Cooling degree days | 307 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.62 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Centersquare Toronto (YYZ2) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Parkway TS (500 kV), about 1.7 km away.
How clean is the power for Centersquare Toronto (YYZ2)?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Centersquare Toronto (YYZ2)?
Centersquare.
Data centers near Markham
- Cyxtera Toronto YYZ2 99 m · 19 MW
- Digital Realty YYZ10 Toronto (371 Gough) 572 m · 14 MW
- Data center in Markham 722 m · 25 MW
- Equinix TR5 - Toronto 1.6 km · 12 MW
- Nuday DC1 2.0 km · 2.4 MW
- Cologix TOR4 2.5 km · 26 MW
- Rogers 2.5 km · 8.6 MW
- Pathway Communications 3.8 km
More Centersquare data centers
- Centersquare Dallas (DFW1) United States
- Centersquare Chicago (ORD2) United States
- Centersquare Atlanta (ATL1-A/B/C) United States
- Centersquare Chicago (ORD4) United States
- Centersquare Northern Virginia (IAD4) United States
- Centersquare New Jersey (EWR5) United States
- Centersquare Northern Virginia (IAD1-C/E) United States
- Centersquare Seattle (SEA1-B) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.