Nuday DC1
Nuday DC1 is an operational data center operated by Nuday Networks in Markham, Canada. Our footprint estimate of its power is about 2.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Nuday Networks |
| Facility power | 2.4 MW (range 1.2 MW to 3.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,971 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 3 networks PeeringDB. |
| Also known as | Nüday Networks |
| Address | 231 Amber St. |
| Coordinates | 43.82695, -79.33447 |
| Website | nuday.com |
Power and grid
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 7.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.8 °C (2001 to 2025) |
| Cooling degree days | 307 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.62 kWh per m² per day |
| Wind at 50 m | 6.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Nuday DC1 use?
We estimate the facility power at about 2.4 MW. Estimate from building footprint, low confidence.
How clean is the power for Nuday DC1?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Nuday DC1?
Nuday Networks.
Data centers near Markham
- Rogers 699 m · 8.6 MW
- Data center in Markham 1.3 km · 25 MW
- Digital Realty YYZ10 Toronto (371 Gough) 1.5 km · 14 MW
- Cyxtera Toronto YYZ2 1.9 km · 19 MW
- Centersquare Toronto (YYZ2) 2.0 km
- EdgeConneX Toronto (EDCTOR01) 2.0 km · 5.3 MW
- Equinix TR5 - Toronto 2.2 km · 12 MW
- Cologix TOR4 2.7 km · 26 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.