Urbacon Data Centre
Urbacon Data Centre is an operational data center in Mount Olive-Silverstone-Jamestown, Canada. Our footprint estimate of its power is about 24 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 24 MW (range 12 MW to 39 MW) Estimate from building footprint, low confidence. Footprint estimate: about 20,364 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 10,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 43.74070, -79.62090 |
Power and grid
| Nearest high-voltage substation | Rexdale TS, 230 kV, 1.5 km away (Hydro One) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Power plants within 50 km | 5.2 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.2 °C (2001 to 2025) |
| Cooling degree days | 288 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.65 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Urbacon Data Centre use?
We estimate the facility power at about 24 MW. Estimate from building footprint, low confidence.
How close is Urbacon Data Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is Rexdale TS (230 kV), about 1.5 km away.
How clean is the power for Urbacon Data Centre?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Data centers near Mount Olive-Silverstone-Jamestown
- CentriLogic Tranmere (TME) 7.3 km
- Digital Realty YYZ11 Toronto (1 Century) 7.4 km
- Serverfarm TOR1 Toronto 7.6 km
- Digital Realty Toronto YYZ11 7.7 km · 69 MW
- Equinix TR7 - Toronto, Brampton (formerly Q9 Brampton 4/5) 7.8 km · 47 MW
- Cogent Mississauga 8.6 km
- Hut 8 GTA2 9.7 km
- Hut 8 GTA1 11.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.