Urbacon Data Centre

Urbacon Data Centre is an operational data center in Mount Olive-Silverstone-Jamestown, Canada. Our footprint estimate of its power is about 24 MW.

Key facts

StatusOperational
Facility power24 MW (range 12 MW to 39 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 20,364 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 10,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates43.74070, -79.62090

Power and grid

Nearest high-voltage substationRexdale TS, 230 kV, 1.5 km away (Hydro One)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km8
Power plants within 50 km5.2 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity192 g CO₂ per kWh (Canada, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5%

Climate and water

Average temperature9.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.2 °C (2001 to 2025)
Cooling degree days288 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.65 kWh per m² per day
Wind at 50 m7 m/s average
Water stress todayLow - Medium (10-20%) (Ontario)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Urbacon Data Centre use?

We estimate the facility power at about 24 MW. Estimate from building footprint, low confidence.

How close is Urbacon Data Centre to the power grid?

The nearest high-voltage substation in OpenStreetMap is Rexdale TS (230 kV), about 1.5 km away.

How clean is the power for Urbacon Data Centre?

The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.