CentriLogic Tranmere (TME)
CentriLogic Tranmere (TME) is an operational data center operated by CentriLogic in Mississauga, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | CentriLogic |
| Networks | 1 networks PeeringDB. |
| Address | 7445 Tranmere Drive |
| Coordinates | 43.68905, -79.67696 |
| Website | centrilogic.com/greater-toronto-ontario-data-center |
Power and grid
| Nearest high-voltage substation | Hurontario SS, 230 kV, 5.6 km away (Hydro One) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 9 |
| Power plants within 50 km | 3.1 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.2 °C (2001 to 2025) |
| Cooling degree days | 288 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.65 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is CentriLogic Tranmere (TME) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Hurontario SS (230 kV), about 5.6 km away.
How clean is the power for CentriLogic Tranmere (TME)?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates CentriLogic Tranmere (TME)?
CentriLogic.
Data centers near Mississauga
- CentriLogic Traders (TRA) 6.8 km
- Equinix TR7 - Toronto, Brampton (formerly Q9 Brampton 4/5) 7.0 km · 47 MW
- Urbacon Data Centre 7.3 km · 24 MW
- Cogent Mississauga 7.4 km
- Hut 8 GTA1 7.8 km
- Maxxam Analytics International Inc. 10.6 km · 19 MW
- 11:11 Systems 10.6 km · 9.1 MW
- CentriLogic Mississauga (MIS) 10.8 km
More CentriLogic data centers
- CentriLogic Arlington (ARL) United Kingdom
- CentriLogic Mississauga (MIS) Canada
- CentriLogic Rochester (ROC) United States
- CentriLogic Traders (TRA) Canada
- CentriLogic York (YOR) Canada
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.