Equinix TR7 - Toronto, Brampton (formerly Q9 Brampton 4/5)

Equinix TR7 - Toronto, Brampton (formerly Q9 Brampton 4/5) is an operational data center operated by Equinix in Brampton, Canada. Our footprint estimate of its power is about 47 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power47 MW (range 24 MW to 76 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 39,498 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 20,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks3 networks
PeeringDB.
Also known asEquinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3) · Equinix TR6 · Equinix TR7
Address1895 Williams Parkway East
Coordinates43.74491, -79.71779
Websiteequinix.com/data-centers/americas-colocation

Power and grid

Nearest high-voltage substationGoreway TS, 230 kV, 3.1 km away (Hydro One)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km7
Power plants within 50 km3.1 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity192 g CO₂ per kWh (Canada, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5%

Climate and water

Average temperature9.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.2 °C (2001 to 2025)
Cooling degree days288 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.65 kWh per m² per day
Wind at 50 m7 m/s average
Water stress todayLow - Medium (10-20%) (Ontario)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix TR7 - Toronto, Brampton (formerly Q9 Brampton 4/5) use?

We estimate the facility power at about 47 MW. Estimate from building footprint, low confidence.

How close is Equinix TR7 - Toronto, Brampton (formerly Q9 Brampton 4/5) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Goreway TS (230 kV), about 3.1 km away.

How clean is the power for Equinix TR7 - Toronto, Brampton (formerly Q9 Brampton 4/5)?

The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.

Who operates Equinix TR7 - Toronto, Brampton (formerly Q9 Brampton 4/5)?

Equinix.