Equinix TR7 - Toronto, Brampton (formerly Q9 Brampton 4/5)
Equinix TR7 - Toronto, Brampton (formerly Q9 Brampton 4/5) is an operational data center operated by Equinix in Brampton, Canada. Our footprint estimate of its power is about 47 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 47 MW (range 24 MW to 76 MW) Estimate from building footprint, low confidence. Footprint estimate: about 39,498 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 20,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 3 networks PeeringDB. |
| Also known as | Equinix TR6 - Toronto, Brampton (formerly Q9 Brampton 1/2/3) · Equinix TR6 · Equinix TR7 |
| Address | 1895 Williams Parkway East |
| Coordinates | 43.74491, -79.71779 |
| Website | equinix.com/data-centers/americas-colocation |
Power and grid
| Nearest high-voltage substation | Goreway TS, 230 kV, 3.1 km away (Hydro One) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 7 |
| Power plants within 50 km | 3.1 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.2 °C (2001 to 2025) |
| Cooling degree days | 288 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.65 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix TR7 - Toronto, Brampton (formerly Q9 Brampton 4/5) use?
We estimate the facility power at about 47 MW. Estimate from building footprint, low confidence.
How close is Equinix TR7 - Toronto, Brampton (formerly Q9 Brampton 4/5) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Goreway TS (230 kV), about 3.1 km away.
How clean is the power for Equinix TR7 - Toronto, Brampton (formerly Q9 Brampton 4/5)?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Equinix TR7 - Toronto, Brampton (formerly Q9 Brampton 4/5)?
Equinix.
Data centers near Brampton
- CentriLogic Tranmere (TME) 7.0 km
- Urbacon Data Centre 7.8 km · 24 MW
- Cogent Mississauga 13.4 km
- CentriLogic Traders (TRA) 13.5 km
- Digital Realty YYZ11 Toronto (1 Century) 14.4 km
- Hut 8 GTA1 14.7 km
- Digital Realty Toronto YYZ11 14.7 km · 69 MW
- Serverfarm TOR1 Toronto 15.4 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.