Data Center Directory

Maxxam Analytics International Inc.

Maxxam Analytics International Inc. is an operational data center in Mississauga, Canada. Our footprint estimate of its power is about 19 MW.

Key facts

StatusOperational
Facility power19 MW (range 9.6 MW to 31 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 16,055 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 8,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates43.60568, -79.74122

Power and grid

Nearest high-voltage substationMeadowvale TS, 230 kV, 4.5 km away (Hydro One)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km7
Power plants within 50 km2.6 GW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity192 g CO₂ per kWh (Canada, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5%

Climate and water

Average temperature9.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.2 °C (2001 to 2025)
Cooling degree days288 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.65 kWh per m² per day
Wind at 50 m7 m/s average
Water stress todayLow - Medium (10-20%) (Ontario)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Maxxam Analytics International Inc. use?

We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.

How close is Maxxam Analytics International Inc. to the power grid?

The nearest high-voltage substation in OpenStreetMap is Meadowvale TS (230 kV), about 4.5 km away.

How clean is the power for Maxxam Analytics International Inc.?

The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.

Data centers near Mississauga

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.