Centersquare Toronto (YYZ1)
Centersquare Toronto (YYZ1) is an operational data center operated by Centersquare in Mississauga, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Centersquare |
| Networks | 3 networks, 1 internet exchanges PeeringDB. |
| Address | 6800 Millcreek Drive |
| Coordinates | 43.59505, -79.75430 |
| Website | centersquaredc.com/data-centers/toronto |
Power and grid
| Nearest high-voltage substation | Meadowvale TS, 230 kV, 3.2 km away (Hydro One) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Power plants within 50 km | 2.6 GW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 8.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.3 °C (2001 to 2025) |
| Cooling degree days | 339 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.65 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Centersquare Toronto (YYZ1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Meadowvale TS (230 kV), about 3.2 km away.
How clean is the power for Centersquare Toronto (YYZ1)?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Centersquare Toronto (YYZ1)?
Centersquare.
Data centers near Mississauga
- Cyxtera Toronto YYZ1 112 m · 12 MW
- 11:11 Systems 489 m · 6.7 MW
- CGI 950 m · 3.5 MW
- Maxxam Analytics International Inc. 1.6 km · 19 MW
- 11:11 Systems 1.8 km · 9.1 MW
- CentriLogic Traders (TRA) 7.7 km
- Cogent Mississauga 2 9.4 km
- CentriLogic Mississauga (MIS) 9.5 km
More Centersquare data centers
- Centersquare Dallas (DFW1) United States
- Centersquare Chicago (ORD2) United States
- Centersquare Atlanta (ATL1-A/B/C) United States
- Centersquare Chicago (ORD4) United States
- Centersquare Northern Virginia (IAD4) United States
- Centersquare New Jersey (EWR5) United States
- Centersquare Northern Virginia (IAD1-C/E) United States
- Centersquare Seattle (SEA1-B) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.