Data Center Directory

CGI

CGI is an operational data center in Mississauga, Canada. Our footprint estimate of its power is about 3.5 MW.

Key facts

StatusOperational
Facility power3.5 MW (range 1.7 MW to 5.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,891 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressCentury Avenue 6820
Coordinates43.60132, -79.74629

Satellite view

Questions

How much power does CGI use?

We estimate the facility power at about 3.5 MW. Estimate from building footprint, low confidence.

Data centers near Mississauga

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.