Cogent Mississauga 2
Cogent Mississauga 2 is an operational data center operated by Cogent Communications in Mississauga, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Cogent Communications |
| Address | 55 City Centre Drive |
| Coordinates | 43.59372, -79.63811 |
| Website | cogentco.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 3 km away (Hydro One) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 9 |
| Power plants within 50 km | 2.6 GW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.2 °C (2001 to 2025) |
| Cooling degree days | 288 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.65 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Cogent Mississauga 2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 3 km away.
How clean is the power for Cogent Mississauga 2?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Cogent Mississauga 2?
Cogent Communications.
Data centers near Mississauga
- CentriLogic Mississauga (MIS) 312 m
- CentriLogic Traders (TRA) 4.6 km
- Hut 8 GTA1 5.5 km
- 11:11 Systems 7.9 km · 9.1 MW
- eStruxture TOR-3 8.2 km
- Maxxam Analytics International Inc. 8.4 km · 19 MW
- CGI 8.8 km · 3.5 MW
- Compass 8.8 km · 39 MW
More Cogent Communications data centers
- Cogent Elkridge United States
- Cogent Data Center United States
- Cogent Dijon France
- Cogent Toulouse France
- Cogent Tours France
- Cogent Lille France
- Cogent Rouen France
- Omaha Switch United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.