CentriLogic York (YOR) is an operational data center operated by CentriLogic in Toronto, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | CentriLogic |
| Networks | 2 networks PeeringDB. |
| Address | 55 York Street |
| Coordinates | 43.64623, -79.38251 |
| Website | centrilogic.com/toronto-ontario-data-center |
Power and grid
| Nearest high-voltage substation | John TS, 115 kV, 600 m away (Hydro One) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Leaside Transformer Station, 230 kV, 6.7 km away |
| HV substations within 10 km | 32 |
| Power plants within 50 km | 5.2 GW in 9 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.2 °C (2001 to 2025) |
| Cooling degree days | 288 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.65 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is CentriLogic York (YOR) to the power grid?
The nearest high-voltage substation in OpenStreetMap is John TS (115 kV), about 600 m away.
How clean is the power for CentriLogic York (YOR)?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates CentriLogic York (YOR)?
CentriLogic.
Data centers near Toronto
- Equinix TR4 - Toronto (formerly Q9 Toronto 2/3/4) 66 m
- eStruxture TOR-2 182 m
- Equinix TR1 - Toronto 216 m · 35 MW
- Telehouse Toronto (250 Front St West) 524 m
- 1YongeColo 780 m
- Equinix TR2 - Toronto 1.7 km · 30 MW
- Cologix TOR2 2.4 km
- Telus 6.8 km · 6.8 MW
More CentriLogic data centers
- CentriLogic Arlington (ARL) United Kingdom
- CentriLogic Mississauga (MIS) Canada
- CentriLogic Rochester (ROC) United States
- CentriLogic Traders (TRA) Canada
- CentriLogic Tranmere (TME) Canada
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.