Equinix TR1 - Toronto is an operational data center operated by Equinix in Toronto, Canada. Our footprint estimate of its power is about 35 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 35 MW (range 18 MW to 56 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,887 m² building outline x 6 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 15,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 143 networks, 5 internet exchanges PeeringDB. |
| Also known as | Neutral Data Toronto · Telehouse Toronto (151 Front St West) · Cologix TOR1 · Bell Toronto · Coloware YTZ1 · eStruxture TOR-1 |
| Address | 151 Front St |
| Coordinates | 43.64467, -79.38413 |
| Website | equinix.com/locations/americas-colocation/canada-colocation/toronto-data-center/tr1 |
Power and grid
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 9.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.2 °C (2001 to 2025) |
| Cooling degree days | 288 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.65 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix TR1 - Toronto use?
We estimate the facility power at about 35 MW. Estimate from building footprint, low confidence.
How clean is the power for Equinix TR1 - Toronto?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Equinix TR1 - Toronto?
Equinix.
Data centers near Toronto
- CentriLogic York (YOR) 216 m
- Equinix TR4 - Toronto (formerly Q9 Toronto 2/3/4) 280 m
- eStruxture TOR-2 307 m
- Telehouse Toronto (250 Front St West) 368 m
- 1YongeColo 834 m
- Equinix TR2 - Toronto 1.9 km · 30 MW
- Cologix TOR2 2.3 km
- Telus 7.0 km · 6.8 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.