Data Center Directory

Cologix TOR2

Cologix TOR2 is an operational data center operated by Cologix in Toronto, Canada. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorCologix
Networks12 networks, 3 internet exchanges
PeeringDB.
Also known asTelehouse Toronto (905 King Street West) · Cologix TOR3
Address905 King St. West
Coordinates43.64167, -79.41227
Websitecologix.com

Power and grid

Nearest high-voltage substationStrachan TS, 115 kV, 500 m away (Hydro One)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationLeaside Transformer Station, 230 kV, 8.2 km away
HV substations within 10 km31
Power plants within 50 km5.1 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity192 g CO₂ per kWh (Canada, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5%

Climate and water

Average temperature9.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.2 °C (2001 to 2025)
Cooling degree days288 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.65 kWh per m² per day
Wind at 50 m7 m/s average
Water stress todayLow - Medium (10-20%) (Ontario)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Cologix TOR2 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Strachan TS (115 kV), about 500 m away.

How clean is the power for Cologix TOR2?

The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.

Who operates Cologix TOR2?

Cologix.

Data centers near Toronto

More Cologix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.