Data Center Directory

Cologix COL4

Cologix COL4 is an operational data center operated by Cologix in Columbus, United States. Our footprint estimate of its power is about 9.1 MW.

Key facts

StatusOperational
OperatorCologix
Facility power9.1 MW (range 4.5 MW to 15 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 7,577 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Address7500 Alta View Boulevard
Coordinates40.11844, -83.00000
Websitecologix.com/data-centers/columbus/columbus/col4s

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 100 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 765 kV, 7.1 km away
HV substations within 10 km14
UtilityCity Of Columbus (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineColumbia Gas Trans Co, interstate pipeline, 9.9 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.5 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity536 g CO₂ per kWh (Ohio, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20%
Industrial power priceUSD 0.098 per kWh (Ohio, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38 °C (2001 to 2025)
Cooling degree days504 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.86 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (Ohio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Cologix COL4 use?

We estimate the facility power at about 9.1 MW. Estimate from building footprint, low confidence.

How close is Cologix COL4 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 100 m away. The local utility is City Of Columbus, in the PJM balancing area.

How clean is the power for Cologix COL4?

The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.

Who operates Cologix COL4?

Cologix.

Data centers near Columbus

More Cologix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.