Cologix LAK1
Cologix LAK1 is an operational data center operated by Cologix in Lakeland, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Cologix |
| Networks | 3 networks PeeringDB. |
| Address | 2850 Interstate Drive |
| Coordinates | 28.07962, -81.97518 |
| Website | cologix.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 1 km away (City of Lakeland) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Utility | City Of Lakeland (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | FMPP |
| Nearest gas pipeline | Gulfstream Pipeline Co, interstate pipeline, 2.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 12 GW in 43 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 436 g CO₂ per kWh (Florida, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6% |
| Industrial power price | USD 0.089 per kWh (Florida, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39 °C (2001 to 2025) |
| Cooling degree days | 1,920 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.87 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | High (40-80%) (Florida) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Cologix LAK1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 1 km away. The local utility is City Of Lakeland, in the FMPP balancing area.
How clean is the power for Cologix LAK1?
The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.
Who operates Cologix LAK1?
Cologix.
Data centers near Lakeland
- Lawton Information Services, LLC 13.5 km
- ACW Winter Haven 25.0 km
- Data center in Polk City 27.5 km · 3.3 MW
- Flexential - Tampa/North (TPA03) 38.6 km · 3.2 MW
- Centersquare Tampa (TPA1) 39.8 km · 10 MW
- Frontier Tampa Main Tandem Office 49.4 km
- AceHost Tampa 49.5 km
- The Franklin Exchange Tampa 49.6 km
More Cologix data centers
- Cologix ASH1 United States
- Cologix TOR4 Canada
- Cologix MTL8 Canada
- Cologix MIN1 United States
- Cologix COL4 United States
- Cologix COL1 United States
- Cologix CGY1 Canada
- Cologix JAX2 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.