Flexential - Tampa/North (TPA03)
Flexential - Tampa/North (TPA03) is an operational data center operated by Flexential in Tampa, United States. Our footprint estimate of its power is about 3.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Flexential |
| Facility power | 3.2 MW (range 1.6 MW to 5.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,658 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 4 networks PeeringDB. |
| Also known as | Flexential Tampa - North |
| Address | 8350 Parkedge Drive |
| Coordinates | 28.07422, -82.36820 |
| Website | flexential.com |
Power and grid
| Nearest high-voltage substation | Davis Substation TECO, 230 kV, 3 km away (TECO) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Utility | Tampa Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | TEC |
| Nearest gas pipeline | Florida Gas Trans Co, interstate pipeline, 700 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 8.9 GW in 39 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 436 g CO₂ per kWh (Florida, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6% |
| Industrial power price | USD 0.089 per kWh (Florida, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.3 °C (2001 to 2025) |
| Cooling degree days | 1,910 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.96 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (Florida) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Flexential - Tampa/North (TPA03) use?
We estimate the facility power at about 3.2 MW. Estimate from building footprint, low confidence.
How close is Flexential - Tampa/North (TPA03) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Davis Substation TECO (230 kV), about 3 km away. The local utility is Tampa Electric Co, in the TEC balancing area.
How clean is the power for Flexential - Tampa/North (TPA03)?
The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.
Who operates Flexential - Tampa/North (TPA03)?
Flexential.
Data centers near Tampa
- Centersquare Tampa (TPA1) 14.4 km · 10 MW
- Frontier Tampa Main Tandem Office 16.3 km
- AceHost Tampa 16.4 km
- The Franklin Exchange Tampa 16.4 km
- Hivelocity 16.5 km
- WOW! Business (Tampa Datacenter) 16.7 km
- Flexential - Tampa/West (TPA01/02) 17.4 km
- Cologix LAK1 38.6 km
More Flexential data centers
- Douglasville 2 United States
- Flexential - Atlanta/Douglasville (ATL5) United States
- Flexential - Portland/Hillsboro 3 (PDX03) United States
- Flexential - Dallas/Plano (DFW01) United States
- Flexential - Denver/Englewood (DEN11) United States
- Flexential - Portland/Hillsboro 2 (PDX02) United States
- Flexential Dallas - Richardson United States
- Flexential - Portland/Hillsboro 4 (PDX04) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.