Flexential - Tampa/West (TPA01/02) is an operational data center operated by Flexential in Tampa, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorFlexential
Networks2 networks
PeeringDB.
Also known asFlexential Tampa - West
Address9417 Corporate Lake Dr
Coordinates28.03695, -82.54094
Websiteflexential.com

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 4.7 km away (TECO)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationWestchase Substation, 230 kV, 5 km away
HV substations within 10 km9
UtilityTampa Electric Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityTEC
Nearest gas pipelineFlorida Gas Trans Co, interstate pipeline, 2.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km7.9 GW in 30 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity436 g CO₂ per kWh (Florida, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6%
Industrial power priceUSD 0.089 per kWh (Florida, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature22.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.3 °C (2001 to 2025)
Cooling degree days1,910 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.96 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayHigh (40-80%) (Florida)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How close is Flexential - Tampa/West (TPA01/02) to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 4.7 km away. The local utility is Tampa Electric Co, in the TEC balancing area.

How clean is the power for Flexential - Tampa/West (TPA01/02)?

The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.

Who operates Flexential - Tampa/West (TPA01/02)?

Flexential.

Data centers near Tampa

More Flexential data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.