Centersquare Tampa (TPA1)
Centersquare Tampa (TPA1) is an operational data center operated by Centersquare in Tampa, United States. Our footprint estimate of its power is about 10 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Centersquare |
| Facility power | 10 MW (range 5.1 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,583 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | Cyxtera Tampa TP1 |
| Address | 9310 Florida Palm Drive |
| Coordinates | 27.94532, -82.35120 |
| Website | centersquaredc.com/data-centers/tampa |
Power and grid
| Nearest high-voltage substation | SR 60 Substation TECO, 230 kV, 1 km away (TECO) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Utility | Tampa Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | TEC |
| Nearest gas pipeline | Florida Gas Trans Co, interstate pipeline, 900 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 13 GW in 45 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 436 g CO₂ per kWh (Florida, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6% |
| Industrial power price | USD 0.089 per kWh (Florida, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.3 °C (2001 to 2025) |
| Cooling degree days | 1,910 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.96 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (Florida) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centersquare Tampa (TPA1) use?
We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.
How close is Centersquare Tampa (TPA1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is SR 60 Substation TECO (230 kV), about 1 km away. The local utility is Tampa Electric Co, in the TEC balancing area.
How clean is the power for Centersquare Tampa (TPA1)?
The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.
Who operates Centersquare Tampa (TPA1)?
Centersquare.
Data centers near Tampa
- Frontier Tampa Main Tandem Office 10.4 km
- AceHost Tampa 10.4 km
- The Franklin Exchange Tampa 10.5 km
- WOW! Business (Tampa Datacenter) 10.6 km
- Flexential - Tampa/North (TPA03) 14.4 km · 3.2 MW
- Hivelocity 18.9 km
- Flexential - Tampa/West (TPA01/02) 21.2 km
- Lawton Information Services, LLC 37.9 km
More Centersquare data centers
- Centersquare Dallas (DFW1) United States
- Centersquare Chicago (ORD2) United States
- Centersquare Atlanta (ATL1-A/B/C) United States
- Centersquare Chicago (ORD4) United States
- Centersquare Northern Virginia (IAD4) United States
- Centersquare New Jersey (EWR5) United States
- Centersquare Northern Virginia (IAD1-C/E) United States
- Centersquare Seattle (SEA1-B) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.