Lawton Information Services, LLC
Lawton Information Services, LLC is an operational data center operated by Lawton Information Services in Lakeland, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Lawton Information Services |
| Networks | 1 networks PeeringDB. |
| Address | 6000 S Florida Ave #7284 |
| Coordinates | 27.95847, -81.96533 |
| Website | lawton-is.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 8 km away (City of Lakeland) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 3 |
| Utility | City Of Lakeland (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | FMPP |
| Nearest gas pipeline | Florida Gas Trans Co, interstate pipeline, 3.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 13 GW in 49 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 436 g CO₂ per kWh (Florida, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6% |
| Industrial power price | USD 0.089 per kWh (Florida, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39 °C (2001 to 2025) |
| Cooling degree days | 1,920 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.87 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | High (40-80%) (Florida) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Lawton Information Services, LLC to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 8 km away. The local utility is City Of Lakeland, in the FMPP balancing area.
How clean is the power for Lawton Information Services, LLC?
The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.
Who operates Lawton Information Services, LLC?
Lawton Information Services.
Data centers near Lakeland
- Cologix LAK1 13.5 km
- ACW Winter Haven 24.4 km
- Centersquare Tampa (TPA1) 37.9 km · 10 MW
- Data center in Polk City 39.4 km · 3.3 MW
- Flexential - Tampa/North (TPA03) 41.6 km · 3.2 MW
- Frontier Tampa Main Tandem Office 48.2 km
- AceHost Tampa 48.3 km
- The Franklin Exchange Tampa 48.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.