Data center in Polk City is an operational data center in Polk City, United States. Our footprint estimate of its power is about 3.3 MW.

Key facts

StatusOperational
Facility power3.3 MW (range 1.6 MW to 5.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,744 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressCommonwealth Avenue North 16182, 33868, Polk City
Coordinates28.29407, -81.83487

Power and grid

Nearest high-voltage substationLake Agnes Substation, 230 kV, 15.5 km away (Tampa Electric Company)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
UtilityTampa Electric Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityTEC
Nearest gas pipelineFlorida Gas Trans Co, interstate pipeline, 8.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.3 GW in 27 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity436 g CO₂ per kWh (Florida, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6%
Industrial power priceUSD 0.089 per kWh (Florida, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature22.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days1,879 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.87 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayHigh (40-80%) (Florida)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Polk City use?

We estimate the facility power at about 3.3 MW. Estimate from building footprint, low confidence.

How close is Data center in Polk City to the power grid?

The nearest high-voltage substation in OpenStreetMap is Lake Agnes Substation (230 kV), about 15.5 km away. The local utility is Tampa Electric Co, in the TEC balancing area.

How clean is the power for Data center in Polk City?

The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.