E-Foam
E-Foam is an operational data center in Winter Garden, United States. Our footprint estimate of its power is about 1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1 MW (range 0.5 MW to 1.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 806 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 430 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Susan B. Britt Court 550, 34787, Winter Garden |
| Coordinates | 28.57794, -81.56455 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 10.6 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Utility | Reedy Creek Improvement Dist (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | FPC |
| Nearest gas pipeline | Florida Gas Trans Co, interstate pipeline, 7.8 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 7.3 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 436 g CO₂ per kWh (Florida, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6% |
| Industrial power price | USD 0.089 per kWh (Florida, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.1 °C (2001 to 2025) |
| Cooling degree days | 1,919 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.87 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | High (40-80%) (Florida) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does E-Foam use?
We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.
How close is E-Foam to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 10.6 km away. The local utility is Reedy Creek Improvement Dist, in the FPC balancing area.
How clean is the power for E-Foam?
The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.
Data centers near Winter Garden
- HostDime Orlando Data Center 17.3 km · 10 MW
- Atlantic.net 17.3 km
- Smart City Telecom Maitland Colo 17.5 km
- HostDime Orlando Tier IV Data Center 17.9 km
- Colo Solutions Downtown Orlando 18.7 km
- CoreSite - Orlando (OR1) 21.9 km
- Data center in Polk City 41.2 km · 3.3 MW
- ACW Winter Haven 63.6 km
Sources
Correct this page or get the data